IMPLEMENTING IAQ IMPROVEMENTS

One-stop solution ensures the desired result. Comprehensive IEQ, energy and system performance analysis are required before correcting the system performance or retrofitting new components. Required system and equipment upgrades are designed based on the customer’s priorities (energy & IEQ). The best way to evaluate various performance improvement options is a calibrated building’s energy performance simulation model.

After the design, the corrective actions (retrofitting, repairing, cleaning and retro-commissioning of equipment and systems) are planned and executed. System commissioning is a key for well-performing building. System performance and Indoor Air Quality need to be verified after the project is finished.